top of page

Profile

Join date: Oct 27, 2020

Posts (32)

Jan 8, 20261 min
NEW YORK CITY DEPARTMENT OF ENVIRONMENTAL PROTECTION
On July 20, 2011, an industrial accident and fire occurred in the Main Building of the North River Wastewater Treatment Plant (NR WWTP). The North River Emergency Response Restoration and Reconstruction Project has been undertaken to restore Area 5A at the North River Plant to the operating capacity available prior to the incident on July 20, 2011. This work has been developed in three phases: 1) Emergency Response; 2) Restoration of Plant Operations; and 3) Reconstruction to full operational...

15
0
Jan 8, 20261 min
NYC SCHOOL CONSTRUCTION AUTHORITY
For over 9 years, Toll has provided Oracle Primavera Information Technology services to the NYC SCA through various partnerships, serving as both a prime consultant and a subconsultant . The SCA uses Oracle Primavera P6 and Oracle Contract Manager (PPM) to manage the life-cycle schedules for all projects, from feasibility through closeout . PPM serves as the scheduling engine for the Project Tracking System (PTS) at the SCA, consolidating large volumes of information on SCA Design and...

12
0
Jan 8, 20261 min
THE PORT AUTHORITY OF NEW YORK AND NEW JERSEY
Included in Toll’s scope was the overall responsibility to lead and coordinate the JFK Airport’s redevelopment program. Toll led major infrastructure reconstruction and site preparation efforts for several airport terminals, as well as site, infrastructure, and utility work in support of the design and construction of new roadways and parking lots at the terminals. Project Challenges/Successes • Fast tracking existing projects • Toll developed a comprehensive management system to assist in...

11
0

Nure Miguel Aiza Bezares

Admin
More actions

Contact us

(212) 920- 4115

 


 

tollinternational@tollintl.com

 


 

  • LinkedIn

Please reach out and hire us  or

apply for employment 

shield-keyhole.png

© 2026 by Toll International LLC. All rights reserved

bottom of page